Introduction:

In the competitive landscape of manufacturing, efficient material management is crucial for success. Proval Consulting took on the challenge presented by a client grappling with material shortages, impacting production and revenue. This case study delves into the client’s initial struggles, Proval’s strategic approach, and the remarkable results achieved through a comprehensive solution.

Client Background:

Our client, a leading manufacturing company, faced a critical issue of material shortages disrupting their production line. This resulted in revenue loss, delayed deliveries, and customer dissatisfaction. The root causes were identified as low inventory accuracy, an inefficient kitting process, and the practice of storing multiple parts in a single bin.

Objectives:

  • Improve inventory accuracy.
  • Optimize the kitting process.
  • Enhance overall material management efficiency.
  • Reduce cycle time for kitting.

Problem Identification

Proval Consulting initiated a thorough analysis of the client’s material management processes.

Solutions Proposed:

The identified issues led to the implementation of a multi-faceted approach:

5S Implementation:

  • Sorted, Set in order, Shined, Standardized, and Sustained.
  • Organized the workspace to eliminate waste, improve flow, and enhance visual management.
  • Sorted, Set in order, Shined, Standardized, and Sustained.
  • Organized the workspace to eliminate waste, improve flow, and enhance visual management.

 Warehouse Revamp:

  • Redesigned the warehouse layout for better material flow and accessibility.
  • Implemented designated storage areas for improved organization.

Cycle Count Program:

  • Introduced a regular cycle count program to ensure ongoing inventory accuracy.
  • Identified and rectified discrepancies promptly.

Value Stream Mapping:

  • Mapped the material flow to identify and eliminate non-value-added processes.
  • Streamlined the kitting process for efficiency.

Implementation:

Proval worked closely with the client’s team to implement the proposed changes. Training programs were conducted to ensure everyone was aligned with the new processes. Regular check-ins and feedback loops were established to address any challenges swiftly.

Results:

The impact of Proval’s intervention was significant:

Cycle Time Reduction:

  • Kitting cycle time reduced from 128 seconds/part to an impressive 10 seconds/part.
  • This led to a streamlined production process and improved overall efficiency.

Cost Avoidance:

  • The total cost avoidance amounted to $220,000 per year.
  • Achieved through reduced downtime, minimized material shortages, and enhanced productivity.

Enhanced Customer Satisfaction:

  • Improved material availability resulted in timely deliveries, boosting customer satisfaction.

Conclusion:

Proval Consulting’s strategic implementation of 5S, warehouse revamp, cycle count programs, and value stream mapping transformed the client’s material management processes. The reduced cycle time and substantial cost avoidance underscore the tangible benefits of Proval’s expertise. This case study serves as a testament to the transformative power of Lean and Six Sigma methodologies in addressing complex challenges and driving sustainable success.
Ready to optimize your material management? Contact Proval Consulting for a tailored solution to elevate your efficiency and bottom line.

Project Details

  • Category: Operational Consulting
  • Client: Leading manufacturing company
  • Location: U.S.A
  • Duration: 6 months
  • Results: 1.Kitting cycle time reduced from 128 seconds/part to an impressive 10 seconds/part. 2.The total cost avoidance amounted to $220,000 per year.